How to Install Foscarini Caboche Chandelier Light — Step-by-Step Guide
Safety Warnings
- Turn off the power at the circuit breaker before installation.
- Installation must be performed by a qualified electrician.
- Ensure the ceiling can support the weight of the fixture.
- Do not exceed the maximum rated wattage (R7S Max 100W).
Specifications
- Rated Voltage: AC 220V
- Frequency: 50~60Hz
- Max Load: R7S 100/200W
Parts List
| No. | Part | Qty |
|---|---|---|
| ① | Bulb | 1 |
| ② | Glass bowl lampshade | 1 |
| ③ | Bow | small 15 pcs; medium 27 pcs; large 41 pcs |
| ④ | lampshade | 1 |
| ⑤ | Ceiling mount bar | 1 |
| ⑥ | screw nut | 1 |
| ⑦ | Decorative ball caps | small 105 pcs; medium 189 pcs; large 287pcs |
| — | Curved arm frame | 1 |
| — | Oval shade pieces | Multiple |
Installation Steps
Step 1 — Prepare the Ceiling Mount
Secure the ceiling mounting bar ⑤ to the ceiling junction box using the provided screws. Ensure it is firmly anchored.
Step 2 — Connect the Wiring
Connect the wires to your ceiling supply, screw the nut 6 to hold on the ceiling plate
Step 3 — Mount the Bulb
Attach the bulb ① from 1 end to another end.
Step 4---Mount the glass lampshade
Mounting glass lampshade ② fasten with screws.
Step 5 — Assemble Bow Ring Frame
Insert the bow ③ to up iron body and the below iron ring plate to connect 2 parts as a frame
Step 6 — Install the Ball Covers
Attach each oval shade piece to the ring frame. Align the clips and press firmly until each shade locks into place. Finish with the decorative ball caps ⑦ on each end.
Step 7 — Final Check & Power On
- Confirm all connections are secure and no wires are exposed.
- Restore power at the circuit breaker.
- Test the light to ensure proper operation.
Care & Maintenance Notes
- Keep all packaging materials until installation is complete.
- For replacement bulbs, use R7S type, maximum 100/200 W.
- Clean with a dry cloth only. Do not use water or chemical cleaners.